PENGENDALIAN BIAYA DAN WAKTU PAD APROYEK PEMBANGUNAN KONSTRUKSI ( STUDI KASUS: PROYEK GEDUNG UPT BPMP-PHMT KOTA PALNGKA RAYA , KM. 38 ) MUHAMMAD HAPIDI text Palangkaraya Perpustakaan UMPR 2024 Cet 1 ind
text
regular print
vii, 47 hlm : ilus.
MUHAMMAD HAPIDI SKRIPSI 51 51 MUH p 251010 20251010022840 INLIS000000000008514 Converted from MARCXML to MODS version 3.5 using MARC21slim2MODS3-5.xsl (Revision 1.106 2014/12/19)