ANALISIS NILAI AKHIR TERHADAP WAKTU MENGGUNAKAN KONSEP EARNED VALUE ANALYSIS PADA PROYEK KONTRUKSI JEMBATAN TUMBANG HIRAN TUMBANG SAMBA CECILLIA ARI WIDYA PUTRI RIADI text Palangka Raya Perpustakaan UMPR 2022 Cet 1 CECILLIA ARI WIDYA PUTRI RIADI SKRIPSI 51 51 CEC a 260804 20260804094711 INLIS000000000010207 Converted from MARCXML to MODS version 3.5 using MARC21slim2MODS3-5.xsl (Revision 1.106 2014/12/19)